M MemberIntel KB
Activity Decisions
S Role landing · Santiago Perez Asis

Welcome, Santiago Perez Asis.

Product + Project Lead, MemberIntel. Reports to Blair. Capacity: 80% MemberIntel / 20% cross-Caseproof, set 2026-05-11. Expanded from Project Manager after Blair decided not to backfill the Product Lead role following Cindy’s departure.

This is your view of MemberIntel from the operational anchor seat — combining PRD ownership and cross-functional execution with sprint cadence, dependency tracking, and risk register. Specs ground you in scope; phased plans and review templates show the cadence; decision rights show the boundaries. The internal JD covers the dual mandate.

Santiago Perez Asis's reading plan
A linear path through the pages most relevant to your role.
  1. 1
    MemberIntel V1 Specification
    The V1 advisor-only spec for MemberPress operators: two-tier brain architecture, Free/Pro pricing model, and a data-flywheel moat built from product mechanics rather than pre-existing proprietary data.
  2. 2
    MemberIntel V2 Specification
    V2 expands MemberIntel to BuddyBoss customers via a sister-company partnership — a low-engineering-risk cross-platform proof point since BB Memberships runs on MemberPress under the hood.
  3. 3
    Phased Plan — Rev 2
    Rev 2 of the team ramp plan, updated after May architecture sessions: adds a dedicated brain-content lead recommendation, recalibrates Phase 2 milestone language for honesty, and moves the differentiation eval to a Phase 3 gate item.
  4. 4
    Phase 1-2 Friction Points
    A companion one-pager surfacing seven decisions where the May architectural commitments conflict with the v1 phased plan. All 7 decisions resolved in the Blair × Seth working session on 2026-05-11 (see /meeting-2026-05-11-blair); resolution summary at the top of this page.
  5. 5
    Decision Rights Matrix
    A binding contract defining who owns which decisions across engineering, product, compliance, and GTM — keeping Seth and Santiago unblocked as peers without escalating every disagreement to Blair. Updated 2026-05-11 to retire the dedicated Product Lead role (Santiago absorbed the duties) and add Russ as Lead Designer.
  6. 6
    Quarterly Architecture Review Template
    A 90-minute fixed-agenda template for quarterly architectural health reviews — covering differentiation gap, cost-per-cohort, reliability, cross-pollination health, compliance posture, and a standing 'one thing that worried me' round — starting Q4 2026 post-GA.
Pages for Santiago Perez Asis
All content tagged for this role across the spec.